AA Electrical Services
Service

Panel Upgrades

Older panels were never built for today’s HVAC systems, EV chargers, and smart appliances. AA Electrical Services upgrades your panel to a modern 200-amp service so your home is safe and ready for what’s next.

Problems we solve

  • Frequent breaker trips
  • Not enough circuits for new appliances
  • Outdated 60- or 100-amp service
  • EV charger cannot be installed
  • Insurance requires a modern panel

Signs you need this service

  • Panel feels warm to the touch
  • You still use fuses
  • Federal Pacific, Zinsco, or Pushmatic panel
  • Lights dim when appliances start
  • Rust or scorch marks inside the box

How AA Electrical Services helps

  • Free on-site panel assessment
  • Permit pulling and utility coordination
  • Full replacement with a modern main breaker panel
  • Grounding, bonding, and code corrections
  • City inspection and clean-up

Why choose us

  • Panel upgrades are our #1 specialty
  • Clean, code-compliant workmanship
  • Straight pricing before we start
  • Serving Los Angeles homeowners for years

FAQ

How long does a panel upgrade take?+

Most residential panel upgrades take a single day. Power is off for a few hours while we work; we coordinate with LADWP so it’s as smooth as possible.

Do I need a permit?+

Yes. We pull the permit and handle the city inspection so everything is documented and insurance-friendly.

How much does a panel upgrade cost?+

Most Los Angeles panel upgrades fall in a predictable range. We give you a clear written estimate before we start — no surprises.

Ready when you are

Los Angeles Electrician
on call 24/7.

Licensed C-10 electricians for panel upgrades, Zinsco & FPE replacement, EV chargers, and emergency repairs across Los Angeles, the San Fernando Valley, Westside, and South Bay.